Route each question to the right equipment brief
Start with the water effect and the site layout. Use the nozzle guide for the display and connection interfaces, the pump guide for hydraulic duty and installation, and the lighting guide for fixture positions and control zones. Describe any additional equipment by the function it must perform in the project.
Include the known utilities, installation responsibilities and maintenance access in the enquiry. Confirm the resulting equipment schedule and model-specific documents with the project team before procurement, rather than treating a general component list as an approved specification.
Related project resources
Confirm proposed models, drawings, operating information and required project documents in the equipment schedule before procurement.