Water Curtain Equipment Resources

Coordinate water-curtain components with the opening, collection area, hydraulic arrangement and the complete architectural or display brief.

Browse Equipment Categories

Connect the equipment to the opening and collection area

Prepare the dimensions and intended appearance of the curtain, together with the collection arrangement and available installation space. Record how the feature will be operated, where the equipment can be serviced and which site interfaces are already fixed.

Use the water-curtain solution page to discuss the complete system. Confirm the proposed distribution, pump and control arrangements together with mounting, access and handover requirements. Agree model-specific drawings and equipment information within the project schedule.

Related project resources

Confirm proposed models, drawings, operating information and required project documents in the equipment schedule before procurement.

Discuss Your Equipment Requirements